Skip to main navigation.

Large Power Service

Schedule A-16-LP - Large Power Service

Type of Service

Three phase, 60 cycle, at available voltage over 50 KVA of transformer capacity.

Base Charge----------------------------------------$275.00 per Month
Demand Charge------------------------------------$ 10.00 per KW
Energy Charge

  • First 200 KWh/KW of Demand - $0.077/KWh
  • Next 200 KWh/KW of Demand - $0.051/KWh
  • Over 400 KWh/KW of Demand - $0.044/KWh

The billing demand shall be the maximum kilowatt demand established by the Consumer for any period of fifteen consecutive minutes during the month for which the bill is rendered, as indicated or recorded by a demand meter and adjusted for power factor as follows:

 

Power Factor Adjustment and Capacitors

The Consumer agrees to maintain unity power factor as nearly as practicable. Demand chargeswill be adjusted for average power factors lower than ninety-five percent (95%) when the District deems it necessary. Such adjustments will be made by increasing the measured demand two percent (2%) for each one percent (1%) by which the average power factor is less than 95% lagging. All motors of 10 H.P. or more must be equipped with properly sized capacitors.

 

Terms of Payment

The above charges are net, the gross being ten percent (10%) higher. In the event the current monthly bill is not paid within ten (10) days from the date of the bill, the gross rates shall apply. Payment must be in the office before 5:00 p.m. on the bill due date of each month to qualify for the net rate. If the bill due date falls on a weekend or a holiday, the payment must be in the office before 5:00 p.m. on the following business day.

 

Powered by Touchstone Energy Cooperatives Logo